Complete bathroom renovation (turnkey)
Complete turnkey bathroom renovation (except painting),
- our tiler and our electrician.
- complete dismantling of old sanitary fixtures, complete removal of wall tiles, top right corner - cutting off old pipes, chiseling channels for new hot water supply, cold water and drainage to shower, toilet, sink, water heater and kitchen positions.
- installation of new pipes, plastering and securing, built-in water meter installation.
- then the electrician ran the cables.
- after that the tiler leveled the walls, made a new screed, applied waterproofing and laid the tiles
Finally, we returned for the second phase and installed all the complete sanitary fixtures.